Roadways-Bridges


THIS PAGE UNDER CONSTRUCTION – MORE TO COME

ACEC ENGINEERING EXCELLENCE AWARD 92nd Avenue Bridge Westminster, CO

 

This concrete girder bridge is the first major road project in the Denver area to use “retained earth” precast concrete abutments. It is the longest two-span bridge, as well as the only concrete girder bridge, on the Denver-Boulder turnpike.

Washington Park Pedestrian Bridge Denver, CO

 

 

Gold Hill Reservoir Ft. Collins CO

Gold Hill Reservoir Ft. Collins CO

 

 

 

RWC’s design team determined that this 15-million gallon reservoir could be repaired for half the cost of replacement. Procedures were developed for controlled demolition sequencing to protect against concrete explosion due to locked-in stress levels. Additionally, a unique grid system of beams was developed to withstand increased burdens on the foundation system created when the reservoir was buried to prolong its working life.

CHAMBER BRIDGE Denver,CO

CHAMBER BRIDGE
Denver,CO

 

 

Print Friendly